DIVISIONS · LIFECYCLE COVERAGE
From drawing board to digital twin to decision.
Most engineering firms own one phase. VB owns all seven.
PLANT LIFECYCLE MATRIX · VB GROUP · v4READ: LEFT → RIGHT
Phase →
01
Concept
02
Detailed Engineering
03
Build
04
Commission
05
Twin
06
Operate
07
Continuously Improve
EngineeringDivision 01
Digital MfgDivision 02
METADivision 03
Lead engagement
Supporting role
Three lanes · seven phases · zero hand-offs
01
GENESIS · A DECADE OF BROWNFIELD ENGINEERING
2014
FoundedPower-system engineering practice spins out as VB Engineering in India.
2017
First Gulf clientArc-flash & PSS rollout into Middle East refineries.
2020
3D LiDAR practiceLeica RTC360 capability launched. Brownfield digital twins begin.
2023
1,000+ studiesCumulative milestone. Footprint reaches 21 countries, 8 industries.
2026
Now50,000+ LiDAR scans. The data backbone for every digital platform we ship.
POWER SYSTEM STUDY · ARC FLASH RISK ASSESSMENT
DELIVERABLE TYPE · ELECTRICAL SAFETY · BROWNFIELD
STANDARDS · IEEE 1584-2018 · NFPA 70E-2024 · IEC 60909 · OSHA 29 CFR 1910.269
Callouts (see drawing →)
1
Incoming MV switchgear132 kV / 33 kV interface. Source impedance modelled per IEC 60909.
2
Power transformerTwo-winding, ONAN/ONAF cooling. Magnetising inrush + decay constants captured.
3
LV PCC bus415 V distribution. Arc flash boundary calculated at every bolted bus connection.
4
Arc flash zone markerIncident energy mapped in cal/cm². PPE category & working distance specified per NFPA 70E.
5
Relay coordination pointTime–current curves harmonised. Selectivity ratio > 0.3 across the protection scheme.
Deliverable package
- Single-line diagram (SLD), issued for review
- Short-circuit study report (3-phase, line-to-ground, double line-to-ground)
- Arc-flash hazard analysis with PPE-category labels per bus
- Protection coordination study with relay setting sheets
- Power-quality assessment (harmonics, voltage flicker)
- Plant-side recommendations & implementation roadmap
SCALE 1:50 · NOT FOR CONSTRUCTION
FILE · VB-ENG-PSS-0142 · REV C
CAPABILITY · A
3D LiDAR Scanning
Leica RTC360 + cloud post-processing. We deliver registered point clouds, 2D drawings (P&ID, isometric, structural) and IFC-format BIM exports. ±1.9 mm precision across 50,000+ scans completed.
ISO 17123-9 · BS 7385-2 · BIM LOD 350
CAPABILITY · B
HAZOP & Risk Studies
Multi-disciplinary HAZOP node analysis with LOPA layering. SIL determination, consequence modelling (Phast / DNV), and recommendation tracking through close-out.
IEC 61882 · IEC 61511 · API RP 754
CAPABILITY · C
Power System Studies
Load flow, short-circuit, arc-flash, relay coordination, harmonic analysis, transient stability. ETAP and DigSilent PowerFactory. Delivered for refineries, smelters, pharma campuses, and data centres.
IEEE 1584 · IEC 60909 · NFPA 70E
COMPOSITE CASE · ANONYMISED
A Tier-1 petrochemical refinery in the Gulf required arc-flash risk assessment across 14 substations and 412 buses inside an eight-week shutdown window. VB Group's engineering team delivered NFPA 70E-compliant labels, switchgear retrofit recommendations, and a relay coordination matrix, closed out before the plant restart.
02
GENESIS · FROM SERVICES TO PRODUCTS
2019
The pivotVB engineers begin building Wistwin internally, first digital twin for a brownfield plant.
2021
Vijai bornAI vigilance platform spun out. PPE-AI deployed at first Hindalco site.
2023
Zentry launched11 statutes mapped. Pass · Gate · Drive · Induct.
2024
ForgecoreIndia-first contract-workforce platform. DPDP · CLRA · BOCW from day one.
2026
78 plants live12,547 assets twinned · 95.8% AI accuracy · 1M+ events/day.
Plant Health Index
87/100
7-day trend · 1 amber asset
⚠ Predictive Alert · T+0.0s
PUMP-12 · Bearing anomaly
RUL 142h · Conf. 94.1%
Action Maintenance work-order dispatched to CMMS
Asset State · Live
1,247NORMAL
3WATCH
0CRITICAL
14SCAN
Twin Layers · Visible
Physical model · IFC LOD 350
LiDAR · 50k+ scans · Leica RTC360
P&ID overlay · ghosted
Live sensors · OPC UA · MQTT
Asset health · colour-mapped
CAM 30° AXONOMETRIC
SCALE 1:120
NORTH ↑
UPDATED 2.4s
WISTWIN · ASSETTWIN MODULE · PREDICTIVE MAINTENANCE
DELIVERABLE TYPE · DIGITAL TWIN PLATFORM
COMPLIANCE · IATF 16949 · SCHEDULE M 2024 · BRSR CORE · ISO 27001:2022
What this twin runs on
1
Edge gatewayOPC UA + MQTT collection from PLCs, SCADA, vibration sensors, condition monitors.
2
Asset Twin computePer-asset state model. P&ID ingested. LiDAR registered. RUL forecast.
3
Predictive alert engineFailure mode prediction with confidence interval. Triggers maintenance work-order in the plant CMMS.
4
Plant Head dashboardPlant Health Index 0–100. Top 3 risks. One-screen view per facility, per site, per group.
5
Audit logHash-chained, tamper-evident. 7-year retention. Inspector Mode for regulator read-only access.
Module suite (10 -Twin's)
- AssetTwin™, asset-level digital twin
- SmarTwin™ · PlanTwin™ · PredicTwin™
- AviraTwin™, environmental + emissions
- ImpacTwin™, impact & scenario
- TrusTwin™ · VolTwin™ · InsighTwin™ · InspectWin™
PLATFORM · 01
Wistwin
Bharat's Digital Manufacturing Platform. 10 trademarked -Twin modules covering asset, schedule, prediction, environment, impact, trust, energy, insight, inspection. 78 plants live.
SCHEDULE M · BRSR CORE · IATF 16949
PLATFORM · 02
Vijai
AI vigilance & surveillance. 9 modules: PPE, fire, gesture, zone, vehicle, crowd, behavioural safety, perimeter, guard tour. 95.8% accuracy across 100+ sites.
10M+ DATA POINTS · 42% INCIDENT ↓
PLATFORM · 03
Zentry
Industrial workforce & access governance. 6 modules: Pass · Gate · Drive · Induct · Learn · Worksheet. 11 statutes mapped including CLRA, Schedule M, IATF, MSIHC, DPDPA. Cloud · Hybrid · On-Prem.
1M+ GATE EVENTS / DAY · 11 STATUTES
COMPOSITE CASE · ANONYMISED
A diversified Indian industrial group twinned twelve process plants on Wistwin inside an eighteen-month rollout. AssetTwin coverage reached 4,200 assets. Predictive alerts cut unplanned downtime by thirty-one percent in the first full operating year. The Plant Health Index became the group CFO's morning briefing screen.
━━ THE PLANT HEAD'S BUYING JOURNEY
From first conversation to continuous operations.
A single Plant Head buying conversation typically touches all three divisions. Here's how the engagement sequences, and which divisions show up at each step.
STEP 01
Scoping
P&ID review · LiDAR baseline · arc-flash gap analysis. The honest baseline before commitment.
Engineering
STEP 02
Design
Detailed engineering deliverables · power system studies · piping & layout · twin baseline established.
EngineeringDigital
STEP 03
Commission
Wistwin AssetTwin goes live · Vijai AI rolled out at zones · Zentry gate-up · Drona induction begins.
Digital
STEP 04
Operate
PHI tracked daily · Forgecore workforce onboarded · continuous VR refresh · audits pulled from the hash-chain.
Digital
STEP 05
Improve
Predictive twin alerts close loop · Vijai sees what humans miss · workforce retrained on new SOPs · plant gets smarter.
EngineeringDigital
Three divisions. One industrial digital twin engine.
Concept to commissioning to continuous operations. Engineering at the base, intelligence above it, immersion across it.