VB Group
VB GROUP / HERITAGE
HERITAGE · A DECADE OF ENGINEERING

Built in India.
Used in twenty-one countries.

Twelve years. One philosophy. Every industrial plant should see, learn and decide. Concept to commissioning to continuous operations. Built and run by the same group.

2014
FOUNDED · HYDERABAD
21+
COUNTRIES SERVED
1,000+
STUDIES DELIVERED
8
INDUSTRIES
ORIGIN · 2014

Why VB
exists.

HYDERABAD · POWER SYSTEM ENGINEERING

In 2014, in India, a small engineering practice opened with one stubborn observation. Every industrial plant in the world ran on engineering reports nobody read, drawings nobody trusted, and dashboards nobody acted on. The plant team knew their plant. The vendors knew their products. But nobody owned the whole picture.

VB was founded to fix that. From day one, the work was the same shape it is today, go to the plant, scan it, understand it, instrument it, and hand the plant team a system they can actually run on.

The first contracts were arc-flash studies and power-system audits for refineries. The second wave was 3D laser scanning. The third. The one that made VB look less like a services firm and more like a category, was Wistwin, the platform that took a decade of plant work and turned it into a digital twin a plant head could decide from.

Twelve years on, VB engineers, twins and visualises industrial plants across 21+ countries. The instinct that started it has not changed.

An engineering report is only valuable when it's acted on. So we designed our entire stack to make action inevitable.
Dr. Maruthi Kasyap GNV FOUNDER · CHIEF EXECUTIVE OFFICER · MANAGING DIRECTOR
THE JOURNEY · 2014 → 2026

A decade of
chapters.

Each chapter widened the work. Engineering first. Then digital. Then immersive. Then a Industrial Digital Twin Engine that knits the three together.
2014
CHAPTER I · FOUNDATION
Founded in India
Power-system engineering and arc-flash studies. VB Engineering opens its doors.
2017
CHAPTER II · INTERNATIONAL
First Gulf client
Arc-flash and PSS work expands into Middle East refineries. The first international footprint.
2020
CHAPTER III · DIGITAL PIVOT
3D LiDAR practice launched
Leica RTC360 fleet deployed. Brownfield digital engineering takes shape. The first twins begin.
2023
CHAPTER IV · GLOBAL
1,000+ studies. 21 countries.
Footprint reaches 21 countries across 8 industries. Cumulative milestone crossed.
2026
CHAPTER V · INDUSTRIAL TWIN
The Industrial Digital Twin Engine
Wistwin platform live across 78 plants. 12,547 assets twinned. The next era of VB begins.
12+
YEARS OF ENGINEERING
50,000+
LIDAR SCANS DELIVERED
78
PLANTS LIVE ON WISTWIN
12,547
ASSETS TWINNED
LEADERSHIP

Chairman, founder & directors.

Sri. Peri Sastry Peri
PRINCIPAL · 01
Sri. Peri Sastry Peri
CHAIRMAN · VB GROUP
LinkedIn
Dr. Maruthi Kasyap GNV
PRINCIPAL · 02
Dr. Maruthi Kasyap GNV
FOUNDER · CEO · MANAGING DIRECTOR
LinkedIn
DIRECTORS · 06

The team.

Dr. KVS Ram Rao
Dr. KVS Ram Rao
PARTNER
LinkedIn
Lakshmi Rani
Lakshmi Rani
CTO & DIRECTOR
LinkedIn
Phani Kumar V
Phani Kumar V
DIRECTOR · PROJECTS
LinkedIn
Vamsi Krishna G
Vamsi Krishna G
DIRECTOR · BUSINESS
LinkedIn
Lakshmi Peri
Lakshmi Peri
DIRECTOR
LinkedIn
Vijay Anumula
Vijay Anumula
DIRECTOR · OPERATIONS
LinkedIn
For media or partnership inquiries about the leadership team, talk to us →
WHAT WE BELIEVE

Four principles.

Not a values poster. The actual rules that govern how VB Group designs an engineering deliverable, a digital twin, or an immersive training module, and how we say no.
PRINCIPLE · 01
Engineering excellence is only excellent when it's measurable.
A report that doesn't move uptime, lower incidents, or save a maintenance window isn't an engineering deliverable. It's paper. Every VB output ships with the metric it changes.
PRINCIPLE · 02
India is not a cost centre. It is an engineering source.
We were built in India. The standards we deliver against. IEEE, NFPA, IEC, ISO, are global. The pricing reflects an Indian source of engineering. The quality reflects nothing of the sort.
PRINCIPLE · 03
Sustainability is not a section. It is a default.
Every VB engagement reduces something, waste, energy, incidents, rework. We don't dedicate a chapter to sustainability. We engineer it in, then prove it with numbers in the close-out report.
PRINCIPLE · 04
Software should obey the plant. Not the other way around.
The plant doesn't reconfigure itself to fit a dashboard. Our platforms. Wistwin, Vijai, Zentry, Forgecore, adapt to the asset, the workforce, and the regulator. The plant stays in command. The software just listens carefully.
NEXT · 2030

Every plant we touch.
Seeing. Learning. Deciding.

The next decade is not about more plants. It is about deeper twins. By 2030, every industrial site VB engineers, and every site we hand to a client, will see itself in real time, learn from its own data, and decide its next action with confidence intervals attached.

Build with us See the three divisions